Mobile Home Building Permit

Download the PDF

Mobile Home Building Permit
All new houses must be completed on the Uniform Dwelling Permit Application. This permit application cannot be used for new home construction. Return this application to the address above along with two copies of scale plans showing the location, actual shape and dimension of the lot to build upon, exact size and location proposed or existing building and accessory building, the lines within which the building shall be erected, altered or moved. The existing and or intended use of each building or part of a building, the number of families the building is intended to accommodate, and such other information with regard to the lot and neighboring lots or buildings as may be necessary. Plan must show dimensions of all lots and buildings and setbacks from lot lines and streets. All easements must be shown on plot map. No project may be built over ANY utility easement. Permit fee of $110.00 must accompany application. Projects within the mobile home park require the signature of the mobile home park owner. THIS IS NOT A BUILDING PERMIT. A PERMIT WILL BE SENT TO YOU AND MUST BE DISPLAYED PRIOR TO ANY WORK BEING DONE.

Plan Files

Scale Plans (Max 2 files, 10Mb ea)
Drop a file here or click to upload Choose File
Maximum upload size: 10MB

Applicant Information

Address
Address
City
State/Province
Zip/Postal

Property Information

Property Address
Property Address
City
State/Province
Zip/Postal

Project Information

$

Identified Subcontractors

Internal Use

$
Application Status
Scroll to Top